Paper Summary

PGS conducts EM feasibility studies in order to confirm that the Towed Streamer EM system will besensitive to changes in target resistivity. A typical feasibility study involves forward modeling for arange of water depths, target depths, target sizes and resistivity scenarios. A feasibility study is not apre-requisite to EM acquisition; rather it is a useful first step when looking at new areas or play types.