TGS is committed to providing the offshore wind industry with a technically and commercially viable ultra-high resolution (UHR) 3D solution at scale. Ground conditions seriously impact wind farm economics and the operational and financial risks can be high.
Having an accurate understanding of seabed and near-surface conditions is key for the development of wind farm locations, and we believe that early access to UHR3D seismic data significantly accelerates the creation of a reliable ground model, minimizes risk, and reduces cycle time.
Legacy PGS was formed in 1991 with the pioneering vision to develop the most efficient 3D operation in the world. In those days, 3D seismic acquisition was done with one or two streamers, a luxury most people couldn’t afford. Legacy PGS changed that. In 1993, legacy PGS towed five streamers; in 1996, it was ten, and five years later, it was 16, which today is a normal operation.
Over 30 years, the number of seismic contractors has risen and fallen. PGS, now TGS, is still here, serving the industry to the highest standards in safety, efficiency and quality. To be here another 30 years from now, TGS must support the energy transition. Our entry into offshore wind is an important part of this effort.
TGS’ 3D wind journey is underway, with our first commercial ultra-high resolution 3D (UHR3D) survey ongoing. This time, we do not start with two streamers. We tow 11 on the first survey and intend to improve our efficiency further.
Time is of the essence in the fight against climate change, both at the global and societal scale and for each individual wind farm project. At TGS, we believe we can help to speed up the development process significantly. We think it is possible to half the time most projects spend on site characterization today.
How can that be done? By providing the right data at the right time.